FunBIM V2 is available

Site tracking,
made clearer.

A new interface, progress tracking that fits the way you work, redesigned reports, drawing revision comparison, daily site reports and transmittals. It is all already in your account.

Update included in your subscription. Nothing to install.

Create the fields of a PDF form in one clickVideo coming soon
Forms

Your PDF forms, built right inside FunBIM.

Upload your form as it is, even a PDF exported from Word with no fields at all: FunBIM finds the areas to fill in and creates the fields for you. You are fully autonomous, no need for Adobe Acrobat or any other software.

  • Automatic detection: text boxes, checkboxes, dates, drop-down lists and signatures.
  • Live adjustments: add, move, rename or delete a field on the PDF preview.
  • Default values: project name, today’s date or author, pre-filled in every new form.
Compare each meeting with the previous oneVideo, in French
Reports

Improved site meeting reports.

Your site meeting reports now compare each meeting with the previous one. You see at a glance what has moved on, without rereading the old report.

  • Progress in figures: observations added, completed or to be redone since the last meeting.
  • Status changes: the old and new status of each observation, side by side.
  • New items flagged: a badge marks every new observation.
  • General remarks: a free-text section in the report, for information that is not an observation.
Generate a report in the fieldVideo, in French
Reports

Your report, generated from the site.

Report generation comes to tablet and smartphone. Once your site visit is over, your report is ready, with no detour through the office.

  • On all your screens: desktop, tablet and smartphone.
  • Right there in the field: the report is generated just after your observations.
  • Fewer back-and-forths: no need to go back to the office to finish it.
Generate a report in the backgroundVideo, in French
Reports

Your reports, without the wait.

Start generating a report and keep working. With the Generate in background button, the report is prepared while you get on with your site.

  • One click: generation starts in the background.
  • No interruption: observations, drawings and forms stay available.
  • Ready when you are: your report is waiting for you at the end.
Compare drawing revisions in the fieldVideo, in French
Drawings and files

Compare revisions in the field.

Drawing revision comparison comes to tablet and smartphone. On site, you see in an instant what changed from one version to the next, with no detour through the office.

  • On all your screens: desktop, tablet and smartphone.
  • Changes spotted: a moved partition, an added opening, a modified dimension.
  • Right version: your teams always work on the latest revision.
Track observations drawing by drawingVideo, in French
Observations

Statistics per drawing.

Your observations and forms are now tracked drawing by drawing. A table groups everything by type, shows the progress of each drawing and the total for your project.

  • Per-drawing view: the percentage of observations dealt with, drawing by drawing.
  • Custom table: columns, trades, drawings and period, you keep what matters.
  • Export: your table in Excel or PDF, in one click.
Scan a room in 3DVideo, in French
Drawings and files

No drawing? Scan the room.

On small sites, there is not always a PDF drawing. With 3D scan, walk around the room with your iPhone or iPad Pro: in a few moments, it becomes your working base, just like a drawing.

  • Scan in a few taps: Files, New, 3D Scan, and off you go.
  • Direct measurements: take your dimensions on the model, with no tape measure or drawing.
  • Observations and photos: document progress directly in the scanned room.

Available on iPhone Pro and iPad Pro models with a LiDAR sensor.

The new interface in 60 secondsVideo, in French
Interface

An interface rethought for the field.

Fewer clicks, clearer screens, the same logic on mobile, tablet and desktop. Your teams find everything in the same place, with nothing to relearn.

  • Simpler navigation: everyday actions are one gesture away.
  • Readability: drawings, punch list items and documents breathe, even on a small screen.
  • Continuity: your data, your projects and your habits stay in place.
Set up and track progressVideo, in French
Progress

Progress tracking, your way.

Linear metres, units or surface area: you choose how each work item is counted. You define your statuses and colours. The progress table fills itself in, over time and per person.

  • Three counting modes: linear (lm), unit (u) and surface area (m²).
  • Free statuses and colours: “to do”, “in progress”, “installed”, “checked”, or your own.
  • Progress table: progress by week, by zone and by worker.
The new report templatesVideo, in French
Reports

Reports that look the part.

The templates have been completely redesigned. Cleaner, more readable, in your company’s image. They still come out in one click, but they finally look like your work.

  • Clear layout: photos, drawings and comments in the right place.
  • Your branding: company logo and details at the top of every report.
  • Ready to send: the PDF goes straight to the project manager or the client.
Compare two revisions of a drawingVideo, in French
Drawings and files

Compare revisions on the computer.

When a drawing gets a new revision, FunBIM shows you what moved. No more line-by-line rereading: the changes stand out on their own, and your observations follow the right revision.

  • Automatic detection of the differences between the previous revision and the new one.
  • Nothing missed: a moved partition or an added duct no longer goes unnoticed.
  • History kept: every revision stays available in the project.
Write a daily site reportVideo, in French
Reports

The site day, written up at the end of the day.

Headcount, weather, work done, incidents, photos: the daily site report is filled in from the phone, before leaving the site. It is time-stamped, with the author’s name, and it stays in the project.

  • Quick entry from the field, in a few minutes.
  • Traceability: every report is time-stamped and linked to its author.
  • PDF export with the new report template.
Send a transmittal from the drawing listVideo, in French
Drawings and files

The drawing list sends its own transmittals.

Select the drawings, FunBIM generates the transmittal and sends it from the platform, documents attached. Recipients get everything at once, and you keep a record of the sending.

  • Improved drawing list: revisions, dates and statuses at a glance.
  • Automatic transmittal: generated from your selection, with no re-entry.
  • Sent from FunBIM, attachments included, with the history kept.

A question about V2? Let’s look at it together.

Thirty minutes on a video call to go through what’s new on your own projects and set up your progress tracking.