FunBIM, construction site tracking software
HomeFeaturesPricingAbout
Log inTry for free

Legal notice

Last updated: 1 October 2026.

1. Publisher of the website and the application

The funbim.com website and the FunBIM application (app.funbim.com, iOS and Android apps) are published by:

  • FUNBIM, a French simplified joint-stock company (SAS) with a share capital of €1,241
  • Registered office: 99 rue Floralia, Bâtiment A, 13008 Marseille, France
  • Registered with the Marseille Trade and Companies Register under number 833 433 725 (SIRET 833 433 725 00045)
  • EU VAT number: FR87 833 433 725
  • APE code: 58.29C, application software publishing
  • Phone: +33 1 89 70 38 08
  • E-mail: contact@funbim.com

2. Publication director

Laurent Biancardini, President of FUNBIM.

3. Hosting

  • funbim.com website: Vercel Inc., 440 N Barranca Avenue #4133, Covina, CA 91723, United States, vercel.com.
  • FunBIM application and project data: Google Cloud, Google Ireland Limited, Gordon House, Barrow Street, Dublin 4, Ireland, cloud.google.com. Data hosted in the European Union: database in Belgium (europe-west1), files in France (europe-west9).
  • Mobile apps: distributed through the App Store (Apple) and Google Play (Google).

4. Professional liability insurance

FUNBIM holds professional liability insurance with Hiscox France, 38 avenue de l’Opéra, 75002 Paris, France. Geographical coverage: France.

5. Intellectual property

The website, the application, their structure, texts, images, videos, logos and the FunBIM software are protected by copyright and trademark law. FunBIM is a registered trademark of FUNBIM. Any reproduction, representation, adaptation or distribution, in whole or in part, without FUNBIM’s prior written consent is prohibited, except for uses permitted by law.

The logos of customer companies displayed on the website remain the property of their respective owners and are reproduced with their consent, as commercial references.

6. Personal data and cookies

Personal data processing is described in the privacy policy for the website and in the data protection policy for the application. The website uses HubSpot’s audience measurement and consent management tool; non-essential cookies are only set with your consent, which you can change at any time.

7. Terms of use

Use of the application is governed by the General Terms of Sale. The website is provided as is; FUNBIM endeavours to keep it accurate and available without being able to guarantee it, and reserves the right to change its content at any time.

8. Third-party links and content

The website may contain links to third-party websites and videos hosted on YouTube. FUNBIM has no control over such content and accepts no liability for it.

9. Governing law

This legal notice is governed by French law. For any question, write to contact@funbim.com.

FunBIM is a French 2D/3D construction management app for contractors and MEP trades: punch lists and pre-handover inspections, quality checks, document management (CDE), real-time progress tracking.
© 2026 FunBIM. All rights reserved.Download FunBIM on the App StoreGet FunBIM on Google Play
HomeFeaturesPricingAboutWhat’s newBlog (FR)Help centerAPILegal noticePrivacyData protectionTerms of salecontact@funbim.com+33 1 89 70 38 08Français