Features
Everything you need to run the site.
From the 2D drawing to the 3D model, with AI as backup. Every feature is designed for the field, gloves on.
Punch lists & blocking points
Raise and close punch list items in a blink, or dictate them by voice right on site. Photo, precise pin on the drawing, instant sync. And configure any type of observation: pre-handover inspection, as-built survey, intervention, quality…
Drawings & document management
No more outdated revisions on site: drawing list always up to date, approval workflow, transmittals and the progress of every document.
Digital quality check forms
Ready-to-use templates for MEP contractors, and above all your own documents: quality checks, commissioning, tests… Our automation creates hundreds of forms in seconds with all the project and equipment data. And thanks to object recognition, every form is located directly on the drawing and the model.
Automatic progress tracking
Three types of progress, by unit, linear metres and surface area, freely configurable to track anything: ducts, light fittings, fire dampers… Highlight the installed runs or let automatic recognition do the work: progress calculates itself, by level, zone or equipment.
100% customisable reports
Fully customisable cover page, or bring your own report template. In every report: the issues located on the drawing, photos, dates, status and progress percentage, generated and sent instantly to the stakeholders.
3D visualisation of BIM models
Your 2D drawings become a simplified 3D model. View the 2D sheets generated from the 3D to link the views in tricky areas, then carry on tracking progress on a 2D view that is smarter than a plain PDF. Revit plugin synced in real time.
100% customisable dashboards
Build your dashboard with widgets: every site manager follows their own indicators, in real time.
Object detection on the drawing Coming soon
Circle one symbol, FunBIM finds all the others: equipment, ducts, dampers, light fittings… detected automatically on your PDF drawings. Count, track and highlight by object family, with no re-entry.
Observations dictated by voice Coming soon
You dictate, FunBIM structures: on site, headset or phone in hand, your observation is transcribed live, with the title, trade, due date and priority filled in automatically. 50% faster data entry.
Want to see it on your own drawings?
30 minutes, no commitment, on your own projects.