Construction management app The site.
Under control.

FunBIM, the 2D/3D construction management app: punch lists, quality checks, progress and reports, in real time, from the field to the office. A construction app for desktop, iOS and Android, even offline.

Three workers on a construction site checking the drawing in FunBIM on a smartphone

Used on the sites of

EiffageCegelecSDELBalasUxelloClaugerTunziniIDECDerichebourgAstaldiBarcolairAJSEEPREC
A day with FunBIM

From the morning coffee to the evening report.

Three moments in a site manager’s day, on the real application.

7:30 AM · SITE MEETING
FunBIM: the right drawing revision, approval workflow and transmittal

The right drawing, at the right revision.

Everyone leaves with the same version. The approval workflow is visible, and so is the transmittal.

10:00 AM · PUNCH LIST WALK
FunBIM: punch list item pinned on the drawing with photo and status

Your punch list items, in the right place.

Photo, pin on the drawing, status. You can dictate it, the form fills itself in.

5:00 PM · THE REPORT GOES OUT
FunBIM: site report generated with cover page, photos and progress

The report, with your cover page.

Issues located on the drawing, photos, dates, statuses and progress percentage. In one click.

No more scattered information.

Between emails, paper and WhatsApp groups, site information gets lost. And the delay penalties keep getting closer.

30%of the time spent looking for information

Wrong drawing revision, photo lost on WhatsApp, forgotten punch list item.

Hourslost every week

A form filled in with a pen, photographed, sent back, filed. Then the next one.

15 daysof delay discovered too late

Blocking points between trades surface at the pre-handover inspection, when they already cost money.

Your site toolbox.

Click the +. Each feature has its own video demo, on the real application.

Raise and close punch list items in a blink. Photo, precise pin on the drawing, instant sync. Every type of observation: pre-handover inspection, as-built survey, intervention, quality…
No more outdated revisions on site. Drawing list always up to date, approval workflow, transmittals and annotated PDFs. Everyone opens the right revision, on a tablet or at the office.
Your own documents, digitised: quality checks, commissioning, tests… Hundreds of forms created in seconds, each one located on the drawing.
Three types of progress: by unit, linear metres, surface area. Configurable for anything, from ducts to light fittings to fire dampers. Progress calculates itself.
Fully customisable cover page, or bring your own template. Issues located on the drawing, photos, dates, statuses and progress percentage.
See all features

Landmark projects.

Offices, hospitals, schools, towers: projects tracked in FunBIM, with the majors of the construction industry.

L'Archipel construction site, Vinci headquarters in Nanterre (74,000 m²): FunBIM site tracking with Vinci Energies, Tunzini, Uxello and Saga
Vinci Energies L'Archipel, Vinci headquarters in Nanterre, 74,000 m²Photo credit: Jean-Paul Viguier & Associés
To-Lyon tower construction site in Part-Dieu: HVAC site tracking and quality checks in FunBIM with Lefort Francheteau (Vinci Energies)
Lefort Francheteau To-Lyon tower, Part-Dieu
Hekla tower construction site in La Défense (49 floors, Jean Nouvel): sprinkler tracking, quality checks and blocking points in FunBIM with Uxello
Uxello Hekla tower, La Défense, 49 floorsPhoto credit: Ateliers Jean Nouvel
Huveaune bridges construction site in Marseille: quality, safety and blocking point tracking in FunBIM with Bouygues Travaux Publics
Bouygues Travaux Publics Huveaune bridges, MarseillePhoto credit: Rudy Ricciotti Architectes
Maison de la Radio site in Paris: electrical refurbishment, blocking points and quality checks in FunBIM with Fayat Énergie Services
Fayat Énergie Services Electrical refurbishment of the Maison de la Radio
Lariboisière hospital site in Paris: HVAC and plumbing site tracking in FunBIM with BALAS
BALAS Lariboisière hospital, Paris
Modernisation of Belgrade Nikola Tesla airport: site inspections in FunBIM with Vinci Construction Grands Projets and Terna
Vinci Construction Grands Projets Nikola Tesla airport, Belgrade
14,330 m² office construction site in Fontenay-sous-Bois: punch list closure and plumbing progress in FunBIM with ENGIE Axima
ENGIE Axima 14,330 m² of offices in Fontenay-sous-Bois
Restructuring and extension of the Nicolas-Joseph Cugnot high school: electrical, HVAC and plumbing site tracking in FunBIM with STEPC
STEPC Nicolas-Joseph Cugnot high school, Neuilly-sur-Marne
The Link towers construction site in La Défense: site tracking in FunBIM with Rabobat
Rabobat The Link towers, La Défense
Refurbishment of the Morning Pont de l'Alma office building in Paris: punch list tracking for every trade in FunBIM with Opus'Concepts
Opus'Concepts Morning Pont de l'Alma coworking, Paris
Construction of a 129-bed geriatric care centre in Doullens: 2D 3D plans and site observations in FunBIM with THEG
THEG 129-bed geriatric care centre, Doullens

Find the plan that fits you.

Up to −22% with annual commitment

Read only

Workers, subcontractors, clients: everyone who consults.

FreeForever, with no limit on accounts

  • Access to up-to-date drawings and documents
  • Visibility on the observations that concern them
  • Project update notifications
  • Mobile, tablet and web

Included with every project

2D

Complete site tracking on your PDF drawings.

€35 excl. VAT / user / monthBilled annually, €420 excl. VAT /year /licence

  • Unlimited progress tracking and forms
  • Custom reports and electronic signatures
  • Unlimited projects and storage
  • Technical support included

or try it free for 15 days

Recommended, includes 3D

3D

Everything in FunBIM 2D, plus your BIM models in the field.

€65 excl. VAT / user / monthBilled annually, €780 excl. VAT /year /licence

  • Unlimited 3D models: Revit, IFC, Navisworks
  • Observations and forms directly on the 3D model
  • 2D sheets linked to 3D views, progress calculation
  • Site reports and data export

or test 3D in a demo on your own models

Compare all plans

So many reasons to choose FunBIM.

Free trial.

15 days to test in real conditions, no credit card required.

Personalised demo.

30 minutes, on your own drawings and models if you wish.

Support.

A French team that knows the site, to train yours.

Everywhere.

Smartphone, tablet and computer, on iOS, Android and Mac.

Deliver your projects with peace of mind.

30 minutes, on your own drawings if you wish. No commitment.