No more signing form by form at the end of the day: tick all the forms to sign in the list, sign once, and your signature is placed on each of them.

1

Select the forms

In your project, open “Forms” in the left-hand menu. Tick the box of each form to sign, or the box in the list header to select them all.

2

Click “Sign”

The “Sign” button appears in the action bar of the selection. A first form opens full screen with its values; its fields cannot be edited here.

3

Place your signature

Click “Place the signature”, sign with the mouse, a finger or a stylus, then put the signature in the right place. You can move it, resize it or start again with “Redo the signature”.

If your selection mixes several form templates, FunBIM asks for one signature per template, because its position changes from one template to another. Click “Next”, then “Reuse my signature”: the same drawing comes back without redrawing it, and you only have to drag it into place.

4

Confirm

Click “Finish”: a summary gives the number of forms per template. Confirm with the “Sign” button, which repeats that number. A report then shows how many forms were signed.

On tablet and phone (iOS, Android), the steps are the same: tick the forms in the list, then tap “Sign” in the bar that appears above it.

Signing several forms at once is part of the 2D and 3D plans; it is not offered during the free trial, and the “Sign” button then does not appear in the list. Signing a single form remains possible for everyone (see “How do I fill in a form?”). Details of the plans: “What plans does FunBIM offer?”.