You can try FunBIM for free, then subscribe per user, for all your projects. The plans can be viewed and changed at any time in “My subscription” (left-hand menu, or avatar at the top right).

- START — the free trial: 15 days with all features (configurable observations, multiple projects, customisable site meeting minutes, progress tracking, interactive forms), no credit card required.
- FREE — after the trial, with no time limit: read-only access to your projects and those you are invited to (2D plans, lists of observations and forms), with the ability to write comments.
- 2D — full tracking on PDF plans, unlimited storage (see “2D plan”).
- 3D — the 2D pack plus the digital model (see “3D plan”).
Prices per user and per month are shown on the page, with a monthly or annual commitment (reduced rate), and an additional discount for a 3-year commitment. Deployment can be cloud (data hosted in Europe), on your own servers, or in an isolated environment for sensitive sites.
To order: choose the plan and the commitment, then “Request a quote”; our team will call you back to finalise. Once the subscription is active, the “Company subscriptions” section of the same page lets you assign seats to your colleagues.
