On a busy plan, observation pins overlap or hide the drawing; on a very large plan, they become too small instead. The “Icon size” setting makes all the pins of a plan larger or smaller.

1

Open the plan

In your project, open “Files” in the left-hand menu, then click the plan.

2

Open the plan information

Click the ⓘ icon, to the right of the plan name: the information bubble appears, with the name, type, size and dates of the file.

3

Set the size

Move the “Icon size” slider: the pins change size live on the plan, and the percentage is shown next to it. 100% is the normal size; the setting goes from 16% to 200%. “Reset” goes back to 100%.

On tablet and phone, the same ⓘ bubble offers − and + buttons instead of the slider.

To change where a pin is rather than its size, see “How do I move a pin on the plan?”.