Status conditions make a form's status follow what is ticked on it. All the “Compliant” boxes are ticked: the form moves to “Completed” by itself. One “Non-compliant” box is ticked: nobody can set it to “Completed”.

You set them up once, on the form type, and they apply to every form of that type.

1

Open the form type

On a computer, go to Settings → Observations / Progress / Forms, “Form types” section, then open the type to set up. It must have a PDF with fields, and its statuses must already be saved (see “How do I create a form type?”).

2

Click “Set up conditions”

The button is in the “Status conditions” part of the type. A full-screen window opens: the form on the left, the conditions on the right. A first condition is ready for you.

3

Choose the boxes

Click the boxes directly on the form: they are added to the selected condition, and a second click removes them. The boxes of the selected condition are shown in turquoise, those of the other conditions in orange. You can also pick them from the field list, which has a search.

If the box is part of a single choice (Compliant / Non-compliant / Not applicable), click the answer that must trigger the condition. To accept several answers on the same line, for example “Compliant” or “Not applicable”, click each of them.

Tip: click the answer you want on one line, then add the other lines from the field list (search, then “Select all”). They take the same answer.

4

Complete the sentence

A condition reads like a sentence:

Click “Add a condition” to create another one. The bin icon deletes one.

5

Confirm, then save the type

Click “Confirm conditions”. You are back on the form type, which sums them up: save it for the conditions to apply.

Conditions are set up on a computer. They also apply to forms filled in on tablet and phone (iOS, Android), with an up-to-date app.