Models are stored in the same folder structure as your PDF plans. Open “Files”, click “New” then “Add files”, choose the destination folder and drop your Revit (.rvt), IFC (.ifc) or Navisworks (.nwd) file.

After the upload, the model is converted on our servers: its status shows “Conversion in progress…” before it can be opened. The time depends on the size of the model (from a few minutes to longer for large Revit files). You can leave the page, the conversion continues.

Once converted, click the model in the folder tree to open it in the 3D viewer. Opening it requires the 3D plan: with another plan, the file remains visible in the CDE but is not displayed.

From the FunBIM plugin for Revit, you can export the model's IFC and the PDF sheets in one go: the exported plans are then linked to the model and appear under “2D sheets”.