The “Model browser” button in the viewer toolbar opens the model tree: levels, categories, families, then each element. Click a node to select everything it contains; the model recentres on it.

Combine the tree with FunBIM's “Rectangle selection” tool to grab all the objects of an area in one stroke, then isolate them.

On a tablet, the same commands are available in the viewer built into the app.