+33 6 27 19 12 07 contact@funbim.com

The whole team at FunBIM is happy to introduce its brand new 3D offer !

You can now work in both 2D and 3D on a single platform.

 

Uploading 3D models (revit, navisworks, ifc)

Your models are uploaded in the same place as your pdf documents (2D plans and drawings, forms,…).

You are completely autonomous and can manage your tree view on your own.

 

Viewer 3D

Main model

Fluidité maquette

HVAC model with structural work.

fluidité maquette CVC

Browse your 2D and 3D views

You can easily access the 2D and 3D views of your model.

You can pin issues, forms and oservations on the 2D plan and they will automatically appear on the main model.

And the opposite works too : any annotation created in 3D will be visible in the matching 2D views.

Capture d’écran 2018-11-28 à 10.26.14
Capture d’écran 2019-01-10 à 10.14.39

Create observations on specific objects in the model

Create your observations on specific equipments. You can then assign them to the appropriate team, track their progress, write comments and attach photos.

Réserve sur maquette

Creation of an issue linked to a piece equipment (issues, punchlist, quality …)

Attach your forms to specific objects

Formulaire Maquette

FunBIM allows you to upload all of your forms once they have been made interactive

-Q&A

-safety

-…

You can now pre-write your forms and create them automatically.

Here is an instruction video : https://youtu.be/H2X0D0Brlu0

Use your model’s tree view to display what you want to see. Select items from the tree view :

Capture d’écran 2018-11-21 à 20.19.40

 

                                                  Display the properties of the selected object

Capture d’écran 2018-11-21 à 20.41.33

                                                                                 Make section

Capture d’écran 2018-11-28 à 10.42.45

 

                                                                                 Measure distances

Capture d’écran 2018-11-28 à 10.47.40

 

Upload and display external links

Upload other models on your main model. You can browse through the different trades : structure, plumming, electricity, HVAC, etc

 

      Isolate a piece of equipement and display the area around it. 

Capture d’écran 2018-11-28 à 12.39.23

Do you want more information ?